Connection to the Sunny Home Manager 2.0 via SMA SEMP
To configure the Spelsberg Wallbox Smart Pro with the Sunny Home Manager 2.0 via SMA SEMP, follow the settings in the Spelsberg Wallbox app. Detailed information on the various charging modes and the functions of the Spelsberg Wallbox Smart Pro in conjunction with the Sunny Home Manager 2.0 can be found here (Insert LINK to page). The following parameters must be set:
Parameter overview |
App Parameter | Settings |
SMA SEMP interface | Activate |
SMA charging mode | Selection: Manual configuration Immediate charging Surplus charging
|
SMA minimum energy demand [kWh] | Input [0-1,000 kWh] _ _ _ _ _ (Required for manual configuration charging mode) |
SMA maximum energy demand [kWh] | Input [0-1,000 kWh] _ _ _ _ _ (Required for manual configuration charging mode) |
SMA planned departure time | Enter the desired time in the format HH:MM (Required for manual configuration charging mode) |
Current limitation in the event of failure of the SEMP gateway [A] | Set the maximum charging current (6 - 16 A), in 1 A steps in the event of loss of connection to the Sunny Home Manager 2.0 |
Once parametrisation is complete, click Apply and transfer the settings to the Spelsberg Wallbox via NFC or network communication.
Connection to an energy management system via EEBus
To configure the Spelsberg Wallbox Smart Pro via EEBus, follow the settings in the Spelsberg Wallbox app. The following parameters must be set.
Parameter overview |
App Parameter | Settings |
EEBUS interface | Activate |
Link EEBUS | When the EEBUS capable EMS is displayed, click "Link" and transfer the data to the Spelsberg Wallbox via NFC |
EEBUS charging mode | Selection: |
Cost-optimised charging | Activate (activates the EEBUS Use Case “Self-Consumption Optimasation”) |
Charging current in the event of a connection failure [A] | Sets the maximum charging current (6 - 16 A), in 1 A steps in the event of loss of connection to the EMS |
Once parametrisation is complete, click Apply and transfer the settings to the Spelsberg Wallbox via NFC or network communication.
Connection of an energy management system via Modbus TCP
To configure the Spelsberg Wallbox Smart Pro via Modbus TCP, follow the settings in the Spelsberg Wallbox app. The following parameters must be set.
Parameter overview |
App Parameter | Settings |
Modbus TCP server | Activate |
Modbus register set | Selection: Phoenix TQ-DM100 Open Modbus Charge Control Interface (OMCCI) |
Allow Start/Stop of charging processes | Activate |
Modbus TCP server device address | Input [0-255 kWh] _ _ _ _ _ |
Modbus TCP server port | Input [0-65535 kWh] _ _ _ _ _ |
Note: Information on the Modbus registers is available on request from our technical service.
Once parametrisation is complete, click Apply and transfer the settings to the Spelsberg Wallbox via NFC or network communication.